Client Name
Project Description
Project Started
Malaysia Refining Company Sdn Bhd
To supply blade (3pcs)
Sep-22
Malaysia Refining Company Sdn Bhd
To supply pulley (6pcs)
Sep-22
Petronas Penapisan Terengganu
To supply gasket (1458pcs), belt (1pc),Pulley (1pc)
Sep-22
Malaysia Refining Company Sdn Bhd
To supply gasket (5pcs), O-ring (3pcs)
Sep-22
Malaysia Refining Company Sdn Bhd
To supply plug (60pcs)
Aug-22
Malaysia Refining Company Sdn Bhd
To supply Bearing (4pcs)
Aug-22
Malaysia Refining Company Sdn Bhd
To supply plug (250pcs)
Aug-22
Petronas Penapisan Terengganu
To supply gasket (1pc)
Aug-22
Malaysia Refining Company Sdn Bhd
To supply pulley (10pcs), bearing (5pcs)
Jul-22
Malaysia Refining Company Sdn Bhd
To supply Bearing (5pcs), pulley (2pcs)
Jun-22
Hess Exploration and Production Malaysia B.V
To rectify FBHE-B minor Leak
Jun-22
Hess Exploration and Production Malaysia B.V
To inspect and repair EX FBHE B heart
Jun-22
Malaysia Refining Company Sdn Bhd
To supply pulley (3pcs)
Jun-22
Malaysia Refining Company Sdn Bhd
To supply Bearing (4pcs)
May-22
Malaysia Refining Company Sdn Bhd
To Supply Gasket (8996pcs)
May-22
Malaysia Refining Company Sdn Bhd
To Supply lower bearing (4pcs)
Mar-22
Malaysia Refining Company Sdn Bhd
To supply pulley (21pcs), Gasket (4521pcs), Bearing (10pcs)
Feb-22
E&P O&M Services Sdn Bhd
Supply and delivery of GEA charge Air Cooler for WARTSILA ENGINE 6L24 for BERANTAI
Feb-22
Malaysia Refining Company Sdn Bhd
To supply pulley (6pcs)
Oct-21
Petronas Chemicals Methanol Sdn Bhd
Provision of engineering, procurement, construction and commissioning of new stripped process condensate cooler plate heat exchanger E-151B for Petronas Chemicals Methanol Sdn Bhd
Sep-21
Petronas Chemicals Methanol Sdn Bhd
To supply plate
Aug-21
Malaysia Refining Company Sdn Bhd
To supply gasket and O-ring
Aug-21
Malaysia Refining Company Sdn Bhd
To supply pulley, upper bearing and belt
Jul-21
Malaysia Refining Company Sdn Bhd
To supply pulley and upper bearing
Jul-21
Hess Exploration and Production Malaysia B.V
supply and delivery new panels for feed bottom heat exchanger BT75
Jun-21
Petronas Chemicals Methanol Sdn Bhd
fsr air cooled heat exchanger
May-21
Malaysia Refining Company Sdn Bhd
To supply sheave part
Mar-21
Hess Exploration and Production Malaysia B.V
Repair feed bottom HX-A panel
Mar-21
Malaysia Refining Company Sdn Bhd
To supply pulley
Mar-21
Petronas Floating LNG 2
To supply gasket & plate
Mar-21
PTTEP Sarawak Oil Limited
To supply Heat Exchanger for PTTEP'S production operations
Feb-21
Hess Exploration and Production Malaysia B.V
To install BT75 & BT50
Jan-21
Petronas Chemicals Methanol Sdn Bhd
To supply gasket
Jan-21
Malaysia Refining Company Sdn Bhd
To supply pulley
Jan-21
HM Cryogenics Sdn Bhd
Certificate of brazed plate heat exchanger
Dec-20
Alam Jaya Supplies & Services Sdn Bhd
To supply Sigma K 48 flow glued type gasket
Dec-20
Alam Jaya Supplies & Services Sdn Bhd
To supply Sigma 38 EPDM Glued flow gasket
Dec-20
Malaysia Refining Company Sdn Bhd
To supply pulley
Dec-20
Malaysia Refining Company Sdn Bhd
To supply pulley
Dec-20
Petronas Chemicals Methanol Sdn Bhd
To supply gasket
Nov-20
Malaysia Refining Company Sdn Bhd
To supply pulley
Oct-20
Hess Exploration and Production Malaysia B.V
Inspect and Repair
Oct-20
HM Cryogenics Sdn Bhd
Supply brazed plate heat exchanger
Sep-20
Malaysia Refining Company Sdn Bhd
To supply gasket
Aug-20
Malaysia Refining Company Sdn Bhd
To supply pulley
Aug-20
Malaysia Refining Company Sdn Bhd
To supply gasket
Aug-20
Malaysia Refining Company Sdn Bhd
To supply pulley
Jul-20
Malaysia Refining Company Sdn Bhd
To supply sheave part
Jun-20
Petronas Chemicals Isononanol Sdn Bhd
To supply plug sheet
Jun-20
Hess Exploration and Production Malaysia B.V
Supply and Delivery of plate heat exchanger
Jun-20
Malaysia Refining Company Sdn Bhd
To supply gasket
Jun-20

CALGON CARBON CORPORATION

Project Experiences

CALGON CARBON CORPORATION

ONSHORE

Client Name
Project Description
Project Started
Petronas Fertilizer (Kedah) Sdn Bhd
To Supply Activated Carbon
Jan-15
Malaysia LNG Sdn Bhd
Supply Activated Carbon
Feb-10
Talang Energy
To Supply Activated Carbon
Sep-09
Petronas Ammonia Sdn Bhd
Catalyst, Activated Carbon
Mar-09
Malaysia LNG Sdn Bhd
Catalyst, Activated Carbon
Feb-09
Optimal Chemicals (M) Sdn Bhd
Carbon Activated Calgon
Jan-09
Optimal Chemicals (M) Sdn Bhd
Waste water (activated carbon) treatment project
Oct - 07
Petronas Research & Scientific Services Sdn Bhd
Supply and Deliver y of Calgon HGR-LH Act ivated Carbon and Deta il of RDS and JDS Vessel for Petronas Carigali Mercury Removal Project at Resak OGT and Joint Development, Kerteh
Oct - 05
Petronas Gas Berhad
Supply & delive ry catalyst sulfur Impreg nated activated carbon (CALGON) for mercury removal during GPP-5 Turnaround at GPP Complex-B,Tok Arun, Paka, Dungun
Aug - 05
Petronas Fertilizer (Kedah) Sdn Bhd
Supply chemicals, Gen sulphur impregnated activated carbon
Oct - 04
Optimal Chemicals (M) Sdn Bhd
Supply, store & d eliver of activated carbo n for Glycol Purification Unit at Ethylene Oxide Glyocol plant for Optimal Group of Companies
Oct - 03
Petronas Gas Berhad
Supply & delivery of activated car bon type Calagon HGR 4 X 10 for Mercury Removal Unit at GPP 6
Sep - 03
OGP Technical Services
Supply & Commissioning of Activ ated Carbon Filter pack age for Malaysia LN’s Sulfinol Conversion project
Mar - 03
Petronas Penapisan Melaka
Supply and delivery of activated carbon
Nov - 11
Malaysia LNG Sdn Bhd
Supply and delivery of activated carbon
Feb - 10
Petronas Ammonia Sdn Bhd
Catalyst, Activated Carbon
Mar - 09
Malaysia LNG Sdn Bhd
Catalyst, Activated Carbon
Feb - 09
ExxonMobil Exploration
Supply activated carbon type SGL 8 X 30 MFR Calgon
Nov - 05
Optimal Chemicals (M) Sdn Bhd
Supply activated carbon-Calgon, PN : 300-GLY 8X30 in 1000 lb bags
Nov - 03
Optimal Chemicals (M) Sdn Bhd
Supply, store & d eliver of activated carbo n for Glycol Purification Unit at Ethylene Oxide Glyocol plant for Optimal Group of Companies
Oct - 03
Petronas Gas Berhad
Supply & delivery of activated car bon type Calagon HGR 4 X 10 for Mercury Removal Unit at GPP 6
Sep - 03

WATER WORK DIVISION

Project Experiences

WATER WORK DIVISION

ONSHORE

Client Name
Project Description
Project Started
PNSB Water Sdn Bhd
Upgrading Sludge loading bay covered areas for Wangsa Maju, Sg Rangkap & Sg Gombak and upgrading existing STF bulding at Cheras Batu
Aug - 17
PNSB Water Sdn Bhd
Replacemen t of 6' AC pipe including pipe support & fitting fro m intake to WTP at SG Serai
Aug - 17
PNSB Water Sdn Bhd
Replacement of damag e pipe and malfunction valve of in take Sg Lolo
Mar - 17
Syarikat Perniagaan Peladang Sdn Bhd
PEDU Dam DN 2800 Butterfly Valves and DN Cone Valves Installation
Aug - 16
Beijing Water Group
Refurbishment and Upgrading for Bukit Sah Kemaman
Aug - 16
Cakna Enterprise Sdn Bhd
Construction of water storage tank, piping works, installation of b ooster pump and related works
Mac - 15
Dialog E&I Sdn Bhd
Conversion o f 56 Unit odf Existing Ma nual Valves into Rotork Actuator for Langsat 1 & 2
June - 14
Southern Water Corporation
Southern Water Corporation Replacement of piping and fittings complete with accessories RPF - YP3 TREAT WATER HR4
Jul - 13
Southern Water Corporation
Replacement of piping and fittings complete with accessories RPF - YP2 TREAT WATER MR10, HR1 & HR3
Jul - 13
Southern Water Corporation
Replacement of piping and fittings complete with accessories MR8, MR12 & MR11
Jun -13
Southern Water Corporation
Replacement of valve & penstock complete with accessories RVP - CIP2/YP2/33 & 69 - YP2, RPF - MR3 & HR2
Jun -13
Southern Water Corporation
Replacement of pi ping and fittings, valve & penstock complete with accessories RVP - CIP2/YP3/27 & 35 - YP3, RPF - MR6, MR7 & MR9
Jun -13
Southern Water Corporation
Replacement of mild steel Pipe 6" for suction line service water tank
Mac - 13
Southern Water Corporation
Replacement of piping, discharges pipes, valves and fittings
Mac - 12
Southern Water Corporation
Replacement of suction and discharges pipe , valves and fittings
Mac - 12
Southern Water Corporation
Replacement of pipes and valve System
Dec - 11
Southern Water Corporation
Replacement of 42 units console c/w 180 unit ROTORK actuator
Nov - 11

OUR PROJECT

Project Experiences

Our Project

ONSHORE

Client Name
Project Description
Project Started
Malaysia Refining Company Sdn Bhd
To supply sheave part
Aug -21
Malaysia Refining Company Sdn Bhd
To supply pulley
June-21
Petronas Chemicals Methanol Sdn Bhd
fsr air cooled heat exchanger
June-21
Malaysia Refining Company Sdn Bhd
To supply pulley
Apr-21
Universiti Malaya
Fabrication & Installation of a pilot scale sequencing batch reactor
Mar-21
Petronas Chemicals Methanol Sdn Bhd
To supply gasket
Feb-21
Malaysia Refining Company Sdn Bhd
To supply pulley
Feb-21
HM Cryogenics Sdn Bhd
Certificate of brazed plate heat exchanger
Jan-21
Alam Jaya Supplies & Services Sdn Bhd
To supply Sigma K 48 flow glued type gasket
Jan-21
Alam Jaya Supplies & Services Sdn Bhd
To supply Sigma 38 EPDM Glued flow gasket
Jan-21
Petronas Chemicals Methanol Sdn Bhd
To supply gasket
Dec-20
HM Cryogenics Sdn Bhd
Supply brazed plate heat exchanger
Sept - 20
Petronas Chemicals Methanol Sdn Bhd
Service Maintenance of Aerohub Fire Suppression System and Replacement of parts
Aug - 20
Malaysia Refining Company Sdn Bhd
To supply gasket for Kelvion Bloksma HEX
Aug - 20
Malaysia Refining Company Sdn Bhd
To supply pulley for Kelvion Air Fin Cooler (AFC)
Aug - 20
Malaysia Refining Company Sdn Bhd
To supply gasket for Kelvion Bloksma HEX
Aug - 20
Malaysia Refining Company Sdn Bhd
To supply pulley for Kelvion Air Fin Cooler (AFC)
Jul - 20
Malaysia Refining Company Sdn Bhd
To supply sheave parts for Kelvion Air Fin Cooler (AFC)
Jun - 20
Petronas Chemicals Isononanol Sdn Bhd
To supply plug sheet for Kelvion Air Fin Cooler (AFC)
Jun - 20
Senai Airport Terminal Services Sdn Bhd
The Provision of Upgrading Fire Alarm System For Terminal Building at Kertih Airport, Terengganu
Dec - 19
Petronas Chemical Labuan
Supply Parts & Scheduled Services Maintenance of Aerohub Fire Suppression System at Methanol Plant, Labuan
Nov - 19
KPDNHEP Malaysia
Supply, Installation, Testing, Commissioning & Training of 33 units Camera & CCTV System at Nilai KPDNHEP storage warehouse facility
Oct - 19
KPDNHEP Malaysia
Supply & Assembly of Portable Stage & Reception Counter & Cabinet at Nilai KPDNHEP storage warehouse facility
Oct - 19
Petronas Chemical Labuan Sdn Bhd
Services Maintenance of Aerohub Fire Suppression System at Methanol Plant, Labuan
May -19
Edgenta Propel Berhad
Proposed to Install Signboard for Assembly area at Toll Plazas, Offices & Publics facilities along Lebuhraya Pantai Timur
Apr - 19
Petronas Chemical Labuan Sdn Bhd
Services Maintenance of Aerohub Fire Suppression System at Methanol Plant, Labuan
Mar -19
Petronas Gas Berhad
Supply & Delivery of 168 pieces Filter Element (RO Membrane Cartridges) to Centralized Utility Facility (CUF – Gebeng)
Dec - 18
Petronas Chemical Labuan Sdn Bhd
Services Maintenance of Aerohub Fire Suppression System at Methanol Plant, Labuan
Dec - 18
Petronas Chemical Labuan Sdn Bhd
Services Maintenance of Aerohub Fire Suppression System at Methanol Plant, Labuan
Aug - 18
Konsurtium Air Sdn Bhd
To Supply & Delivery Industrial Diesel Fuel for Sungai Labu WTP Generator
Jun - 18
Petronas Chemical Labuan Sdn Bhd
Services Maintenance of Aerohub Fire Suppression System at Methanol Plant, Labuan
Mar - 18
DZ Angkasa Property Consultans Sdn Bhd
To Repair Drainage Surface water & Sub-surface water Hacking work & make good using high performance water based Epoxy Coating painting
Feb - 18
Egenda Propel Berhad
Contract maintenance to repair, replacement of guardrail, fencing & pothole works at Section N5 including associated work for Lebuhraya Plus Berhad
Nov - 17
Optimal Chemicals (M) Sdn Bhd
Provide Manpower & Equipment Rental (Portable Filtration System) for Treatment of Wastewater from the Collection Pond
Oct - 07
Petronas Carigali Sdn Bhd
Inspection & Supervision of Manual Backwashing of Activated Carbon Filters at Kertih Marine Terminal (OGT)
Sep - 07
Petronas Gas Berhad
Inspection, Repair & Refurbishment of Reverse Osmosis (RO) Test Panel & Control System at Gas Processing Plant (GPP), Complex A, Kertih
Mar - 06
Petronas Gas Berhad
Design & Install of 3 m3/hr Water Filtration System for Wastewater Treatment Plant at Centralized Utility Facility (CUF) Plant
Apr - 02
Petronas Gas Berhad
Engineering, Procurement, Construction & Commissioning (EPCC) of 20 m3/hr Reverse Osmosis (RO) System and 800 m of 3” inter-connecting D.I. Water Transport Piping at Gas Processing Plant (GPP) Complex B, Santong, Dungun
Mar - 98
Petronas Gas Berhad
Engineering, Procurement, Construction & Commissioning (EPCC) of Two (2) Trains of 10 m3/hr Reverse Osmosis (RO) & Deionized (D.I.) Water Treatment System at Gas Processing Plant (GPP) Complex B, Santong, Dungun, Terengganu
Jan - 97